Case Studies

August 18, 2014
AMC HP SRU™ limits environmental impacts in the Flinders Ranges

AMC HP SRU™ limits environmental impact in the Flinders Ranges

Accessibility and environmental impact presented an expensive challenge for the customer’s exploration drilling project, remotely located in South Australia’s Flinders Ranges. AMC’s HP-SRU™ was trialled to minimise site footprint and reduce operational costs at the steep and densely vegetated site.
July 21, 2014
AMC UNDERGROUND SRU™ onsite

AMC’s UG SRU™ reduces water consumption by 86% in Western Australia

The trial demonstrated the unit’s principal economic benefits were reduced water and mud usage, together with associated costs, and improved drilling productivity (drilling KPIs). These benefits were estimated to be AU$7,134 (net savings) per rig per month.
July 18, 2014
AMC SRU™ onsite in Chile

AMC SRU™ saves 147,000L of water in 20 days in Chile

A Chilean AMC SRU™ trial also demonstrated a significant reduction in water and mud consumption, together with other operating costs, when utilising the AMC SRU™ unit. The AMC SRU™ addressed the key challenges experienced at this site, where water access was limited and expensive.
April 20, 2014
SRU™ onsite in Papua New Guinea

AMC’s SRU™ reduces site footprint in Papua New Guinea

With poor site access, minimal space for drilling and overflowing sumps, AMC’s SRU™ was considered an ideal solution for the drilling operator in Morobe, PNG
March 20, 2014
AMC SRU™ onsite in Nevada, USA

AMC’s SRU™ reduces water use by 80% in Nevada

AMC’s SRU™ helped reduce water consumption, environmental impacts and costs of managing waste drilling fluid at an exploration site in Crescent Valley, USA.
December 6, 2013
SRU™ onsite in Western Australia

AMC SRU™ delivers $20,700 savings to operation in Western Australia

AMC SRU™ reduced the client’s operational costs and environmental impact on site in the Sandy Desert, East Pilbara Western Australia.