AMC BOS™ recovers an abandoned hole and boosts productivity in Arizona, USA

AMC BOS™ was a success at the Resolution Mine, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.
May 29, 2017
In all my time drilling at this site, I have never witnessed a product do what the AMC BOS™ had done to improve drilling and loss circulation conditions.
Eric Castleberry, the Drill Supervisor from Resolution Copper trial comments on using the AMC BOS™ for lost circulation
May 29, 2017

AMC BOS™ saves 77% in operational costs compared to traditional cementing method

AMC BOS™ reduced drilling fluids needed by 50%, eliminated the need for a costly, time consuming cementing/grouting and improved the average bit life used.
January 31, 2017

AMC BORE HOLE STABILISER™ improved blast hole utilisation by 30%.

AMC’s BORE HOLE STABILISER™ performed exceptionally well compared to the existing program and resulted in an increased hole utilisation rate of 30% and produced significantly more holes per hour.
January 30, 2017
We can now drill more meters with AMC BORE HOLE STABILISER™ as no PVC is needed to case the holes
The Production Engineer for our Kalgoorlie trial comments on using AMC BORE HOLE STABILISER™ instead of the traditional PVC method.
January 4, 2017

AMC’s SRU™ facilitated the early completion of a civil construction project.

AMC’s SRU™ facilitated the early completion of the micro tunnelling project, reducing the project by four to seven days, while a further five days saving was gained by eliminating the need to dispose of up to 137,500L of fluid.
October 4, 2016

77% reduction in water use achieved by AMC’s HP SRU™ in the Arctic tundra

AMC’s Heli-portable SRU™ reduced the risk of environmental contamination, reducing water consumption and increasing efficiencies in Canada.
October 3, 2016
The SRU™ has substantially lowered our water content; this both reduces the volume of material transported from the rig and reduces the potential of suspended solids to run off in freshet surface waters.
Dave Cox, Site Geologist from Aurora Geoscience comments on the effect of AMC Solids Removal Unit™.
September 12, 2016

AMC BORE HOLE STABILISER™ reduced total drilling costs by 34% in Western Australia

AMC BORE HOLE STABILISER™ successfully negated the need for traditional PVC casing at an underground mine in the Goldfields region of Western Australia.
April 21, 2016
Using AMC RESI DRILL™ in the Kimberley, Western Australia

AMC RESI DRILL™ delivers improved core recovery in North Western Australia

AMC RESI DRILL™ delivered improved core recovery and integrity and maintained hole stability in two locations in North Western Australia.
April 21, 2016

AMC’s SRU™ limits spill risks in protected area in Canada

AMC’s SRU™ was implemented to assist operations and reduce costs on site at a uranium drilling project, located in Canada’s Patterson Lake South.
January 18, 2016

AMC TORQUE GUARD™ delivers improved drilling performance in Kalgoorlie

AMC’s TORQUE GUARD™ enabled a project in the Goldfields of Western Australia to progress and improve production significantly.

Case Studies

May 29, 2017

AMC BOS™ recovers an abandoned hole and boosts productivity in Arizona, USA

AMC BOS™ was a success at the Resolution Mine, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.
May 29, 2017

AMC BOS™ saves 77% in operational costs compared to traditional cementing method

AMC BOS™ reduced drilling fluids needed by 50%, eliminated the need for a costly, time consuming cementing/grouting and improved the average bit life used.
January 31, 2017

AMC BORE HOLE STABILISER™ improved blast hole utilisation by 30%.

AMC’s BORE HOLE STABILISER™ performed exceptionally well compared to the existing program and resulted in an increased hole utilisation rate of 30% and produced significantly more holes per hour.
January 4, 2017

AMC’s SRU™ facilitated the early completion of a civil construction project.

AMC’s SRU™ facilitated the early completion of the micro tunnelling project, reducing the project by four to seven days, while a further five days saving was gained by eliminating the need to dispose of up to 137,500L of fluid.
October 4, 2016

77% reduction in water use achieved by AMC’s HP SRU™ in the Arctic tundra

AMC’s Heli-portable SRU™ reduced the risk of environmental contamination, reducing water consumption and increasing efficiencies in Canada.
September 12, 2016

AMC BORE HOLE STABILISER™ reduced total drilling costs by 34% in Western Australia

AMC BORE HOLE STABILISER™ successfully negated the need for traditional PVC casing at an underground mine in the Goldfields region of Western Australia.