September

September 12, 2017

Maximising drilling fluid performance in HDD

Geodrilling International speaks to Daniel Galpin, Drilling Optimisation Specialist at AMC about the maximising drilling fluid performance in HDD.
September 12, 2017

Scarborough geothermal project

As part of the construction of the Scarborough Beach Pool in Perth, Western Australia, AMC was involved with the supply and management of drilling fluids for the Scarborough Beach Pool Project’s geothermal drilling programme. Adam Jennings, Waterwell Manager for AMC in Perth discusses the achievements and challenges of the project.